The City of Mount Holly owns and operates the Dutchman’s Creek Pumping Station and parallel 14-inch and 12-inch force mains conveying wastewater to their Wastewater Treatment Plant.  Portions of the existing force mains were in need of repair.  The City therefore constructed a parallel 20-inch force main, consistent with their Master Plan.  Overall, the project consists of approximately 2,200 feet of 20-inch force main with interconnections to the existing facilities and was completed in Spring of 2018.