The Project consists of installation of approximately 9,200 feet of sewer outfall varying in size from 24-inch to 42-inch from the vicinity of NC Highway 3 along Rocky River to the existing sewer at the Linwood Farms Pumping Station. The work will include decommissioning of the Linwood Farms Pumping Station. Approximately 680 feet of 8-inch sewer will also be installed to allow for decommissioning of the Harris Village Pumping Station.
Bids were received on February 8, 2018
Awarded to BRS, Inc., Richfield, NC – Bid Tab